This update is three and a half months late. Not much has occurred since this visit at the very end of October, because we’ve been on hold waiting for the septic system to be installed. And the reason for this delay was because of a major communication hiccup between contractors. The electrical trench and water pipe were installed right through the area where the septic field was suppose to be. So we all got together and discussed the pros and cons of viable placement options. Meaning… Once we agreed on the new location, new plans had to be redrawn and then permitted. Then the holidays happened, folks got sick, and the weather has been working against us. Long story short, three point five months later, the septic system has now been installed, but we’re waiting on the electrician to provide an electrical outlet in the pump house so we can plug in a heat lamp to keep the water from freezing and bursting pipes.
Country Retreat
Tumble Moon (Update 10)
Here’s the progress as of Friday, September 15. The interiors have now been painted, the stair bannisters and counter tops are now in place, the water pipes are now connected to the well, and the house now has electricity. The tiling of the kitchen backsplash, bathrooms, and hearth had just began on the day I was there, and as of last week, Friday, October 6, all of this had been completed. This week, the light fixtures and door hardware, which are there and waiting, should be installed, and I will also be ordering all the appliances. Unfortunately, we’ll have to wait to place them until after the floor has been stained. The septic system should also be installed soon. The poor guy who will be doing this had to wait until all the water pipe and electrical trenching had been completed.
Tumble Moon (Update 9)
The fifth and final site plan concept. The wood steps down from the porch have to end in a wood landing because the landing will be about 2′ above the slope below. This is too much grade change for the lower steps. From that landing down to the parking area are formed concrete steps with stone veneer applied to the top surface. There are two identical runs of steps (4 risers and 3 treads) and one 4′ x 4′ landing. We may not need the retaining wall you see near the bottom of the slope, because the lower steps are now going to be formed concrete.
Michael Parkey, the landscape architect, is currently tweaking this concept, and the final site plan should be ready for me to show you in a couple of weeks. Stay tuned.
Tumble Moon (Update 8)
Here’s the progress as of Thursday, June 29. All the cabinetry had been installed, and the carpenter was informed on how to proceed with the trim work. The painter applied floor stain samples and interior paint colors for our approval. Unfortunately the floor stain was not at all what it was suppose to be, but the selected interior wall, ceiling, and window/door trim colors were perfect. The design and materials for the front steps and the descent down to the driveway were finalized, and one final site survey was done. I know I’m forgetting several somethings, but the following photographs should illustrate how far things have progressed.
Tumble Moon (Update 7)
My landscape architect’s accompanying letter:
Attached are three sketches for the driveway, parking, and porch steps.
There are two major problems that we are trying to solve. The first is the elevation change from the finish floor height (FF) of the house (assumed to be 100.0′) and the garage and parking area. The difference is about 10 feet. The second is the tight maneuvering space for cars between the garage and the house.
Tumble Moon (Update 6)
Last week we all met at Tumble Moon to go over wood floor options, exterior colors, and interior paint, tile, and countertop colors. And most importantly to work out the site’s grading and how to develop the approach to the front of the house, which I will cover in a future post.
Tumble Moon (Update 5)
The house is now a structural reality. Charley McKenney and I met the general contractor Pat Fuhrmann today along with his subs to go over the custom cabinetry and the electrical needs for my tiny house. It was perfect spring weather with an incredible cross breeze blowing through the window and door openings. And the views from the windows are even more spectacular than I had imagined. Again, I should have taken my fancy camera with a zoom lens, but instead shot the following photos with my iPhone.
Tumble Moon (Update 4)
With the foundation complete, I and my architect, Charley McKenney, took Eco Friends Pest Control out to Tumble Moon to do the first phase of the termite treatment. The second and final treatment will have to wait until after all construction and exterior grading have been completed.
Tumble Moon (Update 3)
Tumble Moon now has a well, pump house, and garage. Things are really beginning to pick up steam, and if I’m not careful, I could easily become overwhelmed. Even though I experienced the renovation of my home here in Dallas, building something from scratch is a whole ‘nother ball game. And then there’s the driving back and forth to Saint Jo in a single day (two hours there and three frustrating hours back) that will have to be done more frequently.
Tumble Moon (Small Solution #1)
When a traditional nightstand won’t fit, a wall-hung option can be a perfect solution. My bed will be located within the gable alcove, and with only an eighteen inch clearance on either side, a traditional nightstand was going to be too much mass and clutter. After an extensive online search, I found a very affordable option that also had interesting character at El Paso Import Company. I’ve ordered one to make sure it will work for me. If it doesn’t, I would have only spent $29 and can easily use it somewhere else at Tumble Moon. There is one concern, and that is the depth of the shelf, which is listed as being seven inches. That’s not deep enough. Perhaps it can be replaced. We’ll see when it arrives, and I’ll post photos of it.