October 10, 2019. Every surface was scrubbed down, and bronze hardware fixtures were installed in both bathrooms. This included hanging hooks, towel racks, toilet paper holders, and towel rings. Most of the flatware, dinnerware, and drinking glasses were unpacked. While most of the furniture is still in storage and will be moved to Tumble Moon next week, three floor lamps and some furniture were brought from my Dallas home where I had been keeping them until the construction had been completed.